Single value risks calculation

Single value risks can be calculated in two ways.

  • If the option ‘Single value risk calculation method’ is set to ‘From single value risks’ then single value exposures are combined with (single value) hazard characterisations.

  • If the option ‘Single value risk calculation method’ is set to ‘As percentile from risks distribution’ then a percentile can be selected from a risks distribution.

See below for a more detailed explanation.